Subcontractor intake handoff — illustrative sample
Iterative Systems · Subcontractor Intake Sprint
The packet is received.
What happens next?
A sample handoff a project team can inspect before discussing an implementation.
Illustrative example only. Companies, files, statuses and dates below are fictional. This is a sample layout, not completed client work or live document extraction. Your authorized staff define the checklist and approve every decision.
01 · Packet cover sheet
Keep the source with the status.
Sample packet: HBR-001 · Harbor Electric · electrical work
Sample reviewer: Operations coordinator · Review date: October 1, 2026
“Present” is a document inventory result. It does not establish identity, coverage, validity or approval. No actual tax identifiers appear in this sample.
02 · Exception queue
Show the next action, not only a red flag.
03 · Draft for human approval
A missing-item request with context.
Draft subject: Harbor Electric — item to complete packet HBR-001
Hi [subcontractor contact],
We received your packet. Our coordinator has confirmed that [specific item] is required by [approved checklist and version], and we have not located it in the files received.
Please send [item] through [your approved secure channel], or let [packet owner] know if it was already supplied. Reference HBR-001 so we can match it to the right packet.
Thank you,
[Authorized sender]
A staff member verifies the requirement, recipient and wording before sending. This sample sends no messages.
04 · Measure before building more
A timing worksheet for 20 redacted packets.
Use the same packets and agreed checklist for both runs. Include verification, corrections and exceptions in the measured work.
Net time recovered = current total hands-on time − pilot total hands-on time. A negative result means the pilot takes longer. No savings are claimed in this sample.
05 · Decide whether custom work is justified
Start with the unresolved step.
- Which current tool receives the packet?
- What does a person still copy, check or chase?
- How many packets pass through each month?
- Who owns the next action, and what deadline matters?
- Can a standard feature of the existing tool close the gap?
If a real gap remains, the $1,500 pilot covers one checklist, 20 redacted historical packets and one controlled review workflow. $750 at kickoff; $750 on agreed functional acceptance. Proposed duration: 14 calendar days after scope is agreed and required access and redacted samples are received.
Discuss your workflowPlease describe the process in your first message. Do not email tax identifiers, insurance documents or confidential project files. Production rollout and third-party charges are separately scoped.